
Frequently asked questions
Solar questions, answered
Clear answers about solar panel installation, sizing, equipment, costs and maintenance in Pakistan.
Sizing your system
How many solar panels are required for a 1.5-ton AC?
Approximately 6 to 8 modern solar panels are needed to run a 1.5-ton inverter AC during the day.
Read the sizing guideHow many solar panels are required for a 1-ton AC?
Around 4 to 6 solar panels are required for a 1-ton AC.
How many solar panels are required for a 5 kW system?
A 5 kW system typically needs 8 to 10 panels, depending on panel wattage. With 580 W panels, 9 panels give about 5.2 kW.
How do I know what size system I need?
Divide your average monthly units by about 125 to get an approximate size in kW for Punjab. Our solar calculator does this for you, and a site survey confirms the final design.
Use the solar calculatorHow much roof space does solar need?
Plan for roughly 80–100 sq ft of shade-free roof per kW on a flat roof with tilted rows. Elevated structures can make better use of roofs with tanks or obstructions.
Systems & equipment
What is an on-grid solar system?
An on-grid solar system is connected to both the solar panels and the grid. Solar is used first, the grid covers any shortfall, and surplus units can be exported under your DISCO's arrangement.
Compare system typesWhich solar panel is best in Pakistan?
Top Tier-1 panels like LONGi, JA Solar, Jinko and Canadian Solar are considered among the best in Pakistan.
Panel & inverter buying guideWill solar work during load-shedding?
Only hybrid and off-grid systems (with batteries) keep running during outages. A pure on-grid system shuts down for safety when the grid fails.
Which inverter brands do you work with?
Our projects use inverters from brands including Huawei, Growatt, Solis, Sofar and Voltronic, selected to suit each system's size and type.
Lithium or lead-acid batteries?
Lithium (LiFePO₄) batteries last far longer, allow deeper discharge and need less maintenance. Lead-acid is cheaper upfront but needs replacing much sooner.
Working with us
Where are you located and which areas do you serve?
Our office is at House No. 225, Block No. 2, Karim Park, Lahore. We have delivered projects across Punjab, including Lahore, Multan, Faisalabad, Gujranwala, Kasur, Vehari and Bahawalpur.
How do I get a quote?
Call or WhatsApp +92 310 4241796, email info@hbsolartraders.com, or fill in the quote form. Sharing a recent electricity bill helps us size your system accurately.
Request a quoteDo you handle large commercial and industrial projects?
Yes. Our portfolio includes a 1 MW hospital installation, 500 kW and 400 kW university systems and multiple factory projects from 61 kW to 300 kW.
See our projectsDo you offer financing?
Ask our team about flexible payment options when you request your quote. Many banks in Pakistan also offer solar financing products.
How long does installation take?
Most home systems are installed within one to three days once equipment is on site. Larger systems are scheduled in the proposal.
Maintenance & performance
How often should solar panels be cleaned?
In dusty months, every two to four weeks is typical for city rooftops in Punjab. Watch your monitoring app: a steady drop in daily units usually means it's time to clean.
Cleaning & maintenance guideHow long do solar panels last?
Quality panels typically carry 25–30 year linear performance warranties and can keep producing well beyond that. Inverters usually need replacing sooner than panels.
Do you provide cleaning and performance reports?
Yes. Our washing service includes before-and-after output readings and a report on any issues found.
Washing & reporting service
Free consultation
Ready to cut your electricity bill?
Share a recent bill with our engineers and get a tailored solar proposal: system size, components and expected generation. No obligation.